1. Describe the equipment task
Define the movement, load, available supply, run time and installation space. Identify which requirements are fixed and which can be adjusted.
2. Specify a working point
Record the required speed and torque together, with their units and measurement position. Keep no-load, rated-load and start-up conditions distinct.
3. Check integration
Review the shaft, mounting, wiring, control signals, driver and feedback. Include the gearbox output conditions when a gearhead is part of the system.
4. Agree the evidence
Use the matching specification revision, dimensional drawing, wiring information and performance data. Test conditions belong with the data they describe.
5. Validate the sample
Evaluate the configuration in the actual equipment and record any changes before confirming a production specification.
